Four Paths, Two States, One $5 Billion Question
Comparing Arlington Heights, Hammond Wolf Lake, the Illinois Public Stadium Authority, and Chicago South Works across capital stacks, tax structures, game-day logistics, and environmental risk.
Indiana Passed a $1 Billion Framework While Illinois Pivoted to Tax-Exempt Public Ownership
As of late November 2026, no final stadium deal or land acquisition in Indiana has been signed, yet the strategic map has hardened into four distinct options. In February 2026, Indiana enacted Senate Enrolled Act 27 (SEA 27), creating the Northwest Indiana Stadium Authority and up to $1 billion in public support, prompting Bears CEO Kevin Warren to declare Hammond the team’s “sole focus” in August while geotechnical crews drilled near Wolf Lake Terminals.
Illinois’ House and Senate passed different bills in the spring and neither became law, but talks reopened ahead of the Dec. 1–3 veto session around a site-agnostic Public Stadium Authority—paired with a late developer pitch from Related Midwest at the former U.S. Steel South Works lakefront property. Select any option below to see its money, land and main bottleneck.
Arlington Heights: Stable Clay Ground, Stalled Tax Politics
Purchased for $197.2 million in February 2023, the 326-acre former Arlington International Racecourse is the land the Bears already own. The research describes it as stable clay with no wetland permit needed, but the tax fight (the Board of Review set $124.7M, about $8.9M a year) and an $855M infrastructure ask that Springfield never approved left the roughly $5 billion campus plan stuck.
Eliminates federal environmental litigation and subsurface foundation volatility, but depends entirely on Springfield resolving tax certainty and infrastructure funding.
- Land Control & Cost
- Bears-owned 326 acres ($197.2M)
- Team Stadium Equity
- $2.0B+ (within ~$5B campus)
- Public Assistance
- $855M requested (infrastructure)
- Subsurface / Permit Risk
- Minimal (Clean upland clay)
Indiana Commits Public Debt Toward the Venue; Illinois Uses Public Ownership to Zero Out Property Taxes
Comparing headline public numbers across state lines without separating stadium construction from off-site infrastructure distorts the deal math. Indiana’s enacted model—built through House Enrolled Act 1292 (2025) and Senate Enrolled Act 27 (February 2026)—resembles Indianapolis’s 2008 Lucas Oil Stadium structure in relying on a public authority, public borrowing and dedicated local taxes, though the Bears would put in $2 billion alongside about $1 billion in public money.
Illinois’ plan instead has the Bears pay to build the stadium (they’ve pledged more than $2 billion) while a city-created authority owns it. Because a publicly owned stadium pays no property tax, that removes the tax problem without a construction grant. Public money would go to roads and infrastructure (reported near $855M); surrounding development stays taxable. No bill text is public yet.
Proposed Capital Stack Across Options ($ Billions)
Note: South Works has no published project budget or confirmed Bears equity split. Arlington Heights and Hammond figures reflect reported proposals and statutory ceilings rather than finalized construction contracts. Sources: Bears consultant filings; Indiana SEA 27 fiscal note; Illinois legislative reporting (Nov 2026).
How Consumption Taxes & Leasebacks Allocate Risk
Switch financing models, or test the research’s Hammond district-spending forecast ($600M–$900M a year) against about $1B in public money.
Hammond Has Room to Tailgate. The Train to the Gates Isn’t Built
Soldier Field’s problem is physical: about 6,000 parking spaces (per a Bears fan survey reported by WVPE), tight tailgating rules and Lake Shore Drive choke points. The same survey describes 15,000 tailgate spaces at Hammond, near I-90. The South Shore Line’s new Monon Corridor branch (planned as the West Lake Corridor) opened March 31, 2026.
But that line branches south from Hammond Gateway to Munster/Dyer, and no stadium rail link has been announced, so this explorer doesn’t compare game-day train times. South Works touts Metra access and lakefront plazas, though no game-day transportation plan has been published.
Parking & Site Footprint
Note: Soldier Field is included as the current operating baseline. South Works transit relies on developer-cited Metra access without a validated game-day capacity model; its site footprint spans 200–440 acres depending on parcel boundaries.
Regional Effects: Verified Assets vs. Forecast Claims
Proponents project significant spillover across southern Lake County—specifically Crown Point, Winfield, and LOFS—yet urban-planning reviews separate hard infrastructure facts from speculative real-estate modeling.
-
Verified Infrastructure
Monon Corridor rail & I-90 access: The rail branch opened March 31, 2026 (no stadium link announced); the site sits on I-90, and the Bears’ survey describes 15,000 tailgate spaces. -
Directionally Plausible
Retail & Hospitality Spillover: New restaurants, hotels, and service businesses near Wolf Lake and southern Lake County corridors (Crown Point, Winfield, LOFS) typically follow major entertainment venues. -
Unverified Forecast
$600M–$900M in yearly district spending: A forecast, not a fact. Home-value gains in Crown Point, Winfield and LOFS haven’t been independently measured and would depend on the district’s final design, traffic and non-game-day use. -
Unresolved Constraint
Contiguous Parcels & Fan Sentiment: Wolf Lake’s industrial belt includes protected wetlands north of the industrial zone that can’t be developed, plus oil tanks; full season-ticket survey results haven’t been released.
At Wolf Lake, the Research Flags the Ground and Federal Wetland Rules
Soil testing began at Wolf Lake Terminals in late June, and no results are public. The research models an industrial “layer cake” of slag, refinery fill and peat over a high water table, says a standard shallow foundation won’t do the job, and estimates a $100 million+ foundation premium for caissons to bedrock. Its worst case is a “hydraulic piston effect” pushing contamination across the state line; Region 5 covers both states, and nobody has threatened action.
Even more consequential is the Arlington Heights Paradox under Clean Water Act Section 404. Because the Bears already own 326 dry acres in Arlington Heights, the Least Environmentally Damaging Practicable Alternative (LEDPA) test gives the U.S. Army Corps of Engineers strong grounds to favor that site over filling wetlands at Wolf Lake. The presumption can be rebutted, and no Section 404 application is public. IDEM would also need to grant Section 401 certification; Indiana penalties run up to $25,000 per day per violation.
Subsurface Engineering Profile by Site Type
Deep caissons must punch through heterogeneous steel slag and compressible peat to reach load-bearing bedrock, requiring massive dewatering and off-site Indiana Stream and Wetland Mitigation Program (IN SWMP) credits.
When Lead Benchmarks Move (Research Scenario)
Test how regulatory screening shifts affect Wolf Lake’s excavation volume, cost escalation, and post-construction biological liability.
Master Comparison & The Three Strategic Paths
Synthesizing financial architecture, siting logistics, and federal permitting clarifies why the Bears’ Hammond pivot functions simultaneously as a viable exit ramp and a potent negotiating lever. Filter the master matrix below by analytical category, then evaluate the three strategic paths available to the franchise.
| Evaluation Parameter | Arlington Heights (IL) | Hammond Wolf Lake (IN) | Illinois Public Authority | Chicago South Works (IL) |
|---|---|---|---|---|
| Site Status & Land Control | Bears-Owned (326 Acres)Purchased Feb 2023 for $197.2M at former Arlington International Racecourse. | Due Diligence (2 Sites)Lost Marsh and Wolf Lake Terminals; Indiana’s authority would buy the land and lease to the Bears. | Site-Agnostic FrameworkCan apply to Bears-owned Arlington Heights land or a designated Chicago site. | Developer Pitch (200–440 Acres)Controlled by Related Midwest near 87th St & Lake Michigan; no team commitment. |
| Total Project & Team Equity | ~$5.0B Campus / $2.0B+ TeamTeam funds stadium construction alongside $3.0B mixed-use campus vision. | ~$5.0B District / $2.0B Pledged$2.0B Bears pledge toward venue plus ~$3.0B waterfront commercial district. | $2.0B+ (Bears Pay to Build)Bears pay to build; a city-created authority owns the stadium. | Unquantified Cost & SplitNo published total price, team equity pledge, or developer split announced. |
| Public Funding Mechanism | $855M Infrastructure AskRequested for roads, sewers, and rail access; not an enacted appropriation. | About $1.0B Public (SEA 27)1% Lake/Porter food-and-beverage tax, hotel tax 5%→10%, 12% ticket tax, district capture. | Infrastructure + No Property TaxPublic money for roads and infrastructure, reported near $855M; no bill text yet. | Proposed Public–Private ModelDeveloper suggests plugging into IL authority bill; no funding figure disclosed. |
| Property Tax Treatment | High Exposure ($8.9M/yr)$124.7M Cook County assessment triggered multi-year stalemate with school districts. | None on the StadiumA state-created authority would own it; district taxes repay Indiana’s bonds. | $0 on Venue (Public Title)Municipal ownership removes stadium from tax rolls; surrounding retail stays taxable. | $0 Potential (Under Authority)Would depend on municipal authority ownership and final leaseback agreement. |
| Transit & Game-Day Parking | Metra UP-NW · Big CampusRoom for campus parking; relies on suburban roads and the $855M infrastructure ask. | I-90 · 15,000 Tailgate SpacesPer the Bears’ survey; Monon Corridor opened Mar. 2026, no stadium rail link announced. | Depends on Selected SiteInherits transit & parking profile of Arlington Heights (likely) or Chicago site. | Unvalidated Pitch ClaimsDeveloper cites Metra access, parking, and water taxis without validated traffic plan. |
| Subsurface & CAPEX Volatility | $0 Foundation PremiumStable upland native clay allows standard shallow foundations and predictable cost. | $100M+ (Research Estimate)The research models slag, refinery fill and peat requiring deep caissons. | $0 Premium (at Arlington)Clean engineering baseline if built on the Bears’ existing Arlington Heights parcel. | Unpriced (Research Flag)Former steel-mill land; the research flags long-term environmental monitoring. |
| Environmental & Permit Risk | Minimal (Standard Zoning)Zero wetlands; bypasses Clean Water Act Section 404 entirely. | High (Section 404 & Lead)LEDPA review may favor the dry site; research lead benchmarks; penalties up to $25k/day per violation. | Low (at Arlington Heights)Avoids federal wetland litigation if executed on the team’s upland acreage. | Long-Term Monitoring (Research)Former steel-mill land; cost not public. |
| Legislative Status (Nov 2026) | Waiting on IllinoisSpring bills passed one chamber each but not both; hinges on the veto session. | Enacted Law (SEA 27 / HEA 1292)In law since February; Braun’s office says it’s “nearly time” to move on. | Hoped-For Dec. 1–3 VoteRep. Buckner says it’s “on track”; no bill text yet. | Concept OnlyPitched by Related Midwest; the Bears haven’t commented. |
| Primary Franchise Risk | Tax Reassessment UncertaintyDecade-scale political gridlock and rising construction inflation during delays. | Overruns & Federal ReviewFoundation and cleanup costs (research) or a Section 404 setback. | Leaseback Rent & GovernanceHigh operating rent terms or failure to pass consensus in Springfield’s veto window. | Execution & Land ControlSurrendering land ownership control alongside unquantified lakefront remediation costs. |
Evaluate the Bears’ Three Strategic Paths
Accept Subsurface & Federal Risk to Capture Indiana’s $1B Package
The Requirements: Absorb the research’s estimated $100M+ foundation premium, meet lead cleanup levels, buy wetland mitigation credits, and get a Section 404 permit despite owning a dry alternative.
The Trade-Off: Unlocks Indiana’s roughly $1B and room to tailgate, at the cost of budget risk, the research’s 10–15 year environmental horizon and a tough federal permit review.



